What is included:
— partition mounting / dismounting
— construction garbage disposal
— installation of additional partitions (foam concrete blocks, gypsum wallblocks, drywalls, etc.)
— brick and concrete wall chasing for shield and wiring installation
— wiring installation
— wall high quality plaster
— floor coating (tile laying, parquet flooring, laminated flooring)
— painting works (alignment of walls, ceilings, prime coating, gypsum putty)
— alfresco works (painting of walls, ceilings, ceiling and walls hanging, decorative finishing)
— laying, wiring, fittings, piping of engineering heating systems, water supply, etc.
— heat-insulated floor pipes installation
— rough materials (dry mixes, paint, wires, etc.).
Not including finishing materials and special equipment tools